Multi-fuel Pipeline Diversion for New HS2 West Midlands Link

In preparation for the new High Speed 2 (HS2) railway Phase 1 link to the West Midlands and future Phase 2B extension to Leeds, Rayden Engineering Ltd (REL) were contracted by Valero / MPL to divert their existing 300NB (12”) High Pressure (HP) multiproduct pipeline running between Seisdon and Kingsbury in Warwickshire.
Gas Pipeline Diversions & AGI Construction for A1 Improvements

Rayden Engineering we’re appointed Principal Contractor by NGN for this £10m project where we diverted an existing gas pipeline under the A1 motorway and built two new AGIs to make way for a major National Highways Improvement Scheme.
Pipeline Remedial Works at Dunston Quarry

We provided remedial works on Cadent’s Lincoln to Scopwick high pressure pipeline due to defects discovered because of its proximity to Dunston Quarry.
HS2 Cross Country Pipeline Diversion & PRS Rebuild
We were appointed as the Principal Contractor by SGN to divert a 4.5km section of high-pressure gas pipeline to make way for the new HS2 link in Calvert Bucks.
Design & Build of Custom-made Pentagonal Stairway

We produced and installed a new bespoke, pentagon shaped, made to measure, free standing steel stairway for Scottish Power at their unique Loch Doon Fish Pass Building.