BACKGROUND

Cottam Development Centre Power Station (CDC PS) is a 445 MW Combined Cycle Gas Turbine (CCGT) plant located just south of Cottam village, around nine miles east of Retford, Nottinghamshire.

Commissioned in 1999, CDC PS it is owned and operated by Uniper UK and plays a key role in supporting the UK electricity grid during periods of peak demand.

Built on part of the former Cottam Power Station site, CDC PS was developed as a modern, cleaner replacement for the legacy coal-fired plant it succeeded. The original station, comprising four 500 MW units, ceased operation in 2019 as part of the UK government’s low carbon strategy to phase out coal-fired generation by 2025. In contrast, CDC PS operates solely on natural gas – a significantly lower-carbon fuel – delivered via a dedicated pipeline, and exports electricity to the national grid through a 400kV substation.

As a purpose-built gas-fired facility, CDC PS offers far greater efficiency and environmental performance than its predecessor, aligning with the UK’s drive to decarbonise and modernise its energy infrastructure.

Recognising its strategic importance and capability for independent operation, Uniper identified CDC PS as an ideal candidate for a Black Start facility – a site capable of restarting without external power, critical for restoring essential services and stabilising the national electricity grid after a major outage. To realise this potential, Uniper commissioned the CDC PS Black Start Project to deliver the infrastructure upgrades required to enable this function.

ABOUT UNIPER

Uniper-175h

Uniper is a leading international energy company operating in over 40 countries with around 19.5 GW of generation capacity, roughly equal to the total capacity of the Netherlands, making it one of the world’s largest power producers.

Established in 2016 following the spin-off of the E.ON fossil fuel assets, Uniper specialises in flexible, low-carbon energy and aims to be carbon-neutral by 2040.

In the UK, it is a significant power producer and gas supplier, operating power plants, pipelines, LNG infrastructure, and storage facilities.

Cotton Development Centre Power Station External View
Cottom Development Centre (CDC) Power Station, Retford, Nottinghamshire

SCOPE

To deliver the required infrastructure upgrades for the Black Start capability, Uniper UK appointed Rayden Engineering Ltd (REL) as the Principal Contractor under CDM 2015 regulations. REL was responsible for full mechanical and civil designs and delivery of all construction works including:

Scope included:

  1. Detailed design of reinforced foundations, structural steelwork, new gas supply pipeline, & new earthing system.
  2. Supply & construction of above & below-ground drainage systems.
  3. Diversion of existing fire main pipework.
  4. Piling operations & construction of concrete foundations for both onsite & offsite equipment.
  5. Construction & installation of a new gas conditioning skid unit.
  1. Fabrication, installation, & commissioning of a new gas pipeline to feed the new Open Cycle Gas Turbine, including tie-in to the existing pipeline.
  2. Fabrication & installation of a steelwork pipe bridge & associated pipe supports.
  3. Installation of new sitewide earthing system.
DSC01681
Installation of new 250mm MDPE Fire Main
DSC01678
Installation of Connecting Fire Main Pipework
DSC01727
Connecting Fire Main Tie-in

SERVICES DELIVERED

Project Management:

  • Established a dedicated REL project management team to lead all construction, HSE, & QA activities.
  • Responsibilities included planning, programme control, welding procedures, quality control, risk management, emergency planning, temporary works & environmental management.
  • Coordinated delivery of ground investigation, piling, structural & mechanical design with specialist subcontractors.
  • Dedicated Project Management team setup with key REL staff.

Detailed Design

  • In collaboration with specialist partners, REL developed detailed designs for reinforced foundations, structural steelwork, pipe supports, earthing systems, & new 80mm gas supply pipeline.
  • All necessary supporting documentation delivered, including design calculations, fabrication & construction drawings, general arrangements, stress analysis, hazardous area layouts, & justification reports.
  • Mechanical design planned around operational outages & completed in two phases to minimise disruption:
    1. Phase 1: Tie-in at existing gas compound.
    2. Phase 2: Routing from tie-in to new gas conditioning skid.
  • Double block & bleed valves incorporated to ensure effective isolation & safe operations in hazardous areas.
  • Design supported by Caesar II stress analysis; design factor of 0.3 applied per IGEM/TD/13.
  • All civil & structural elements designed to BS 5950, BS 8110, & BS 8004 for steelwork / concrete design. Pipe bridge foundations & loading calculations also completed.
  • Earthing design used CDEGS (Current Distribution Electromagnetic Interference Grounding & Soil Structure Analysis) modelling; compliant with BS EN 50522, BS 7430, & ENA TS 41-24.
  • Key industry standards included: ASME B16.5/16.9/16.20, IGEM/TD/13, IGEM/SR/25, API 5L/6D, BS EN 15614.
  • All design work complied with Building Regulations & CDM 2015.
  • Site investigation & visual survey undertaken to confirm service locations, geological conditions, & to ensure stress tolerances & routing requirements were met.

Fabrication of Steelwork & Pipework:

  • All structural steel & pipework fabricated offsite at REL workshop to BS EN 10025-2, ISO1461 & ISO 14713-1.
  • Fabrication of steelwork for pipe bridge, pipe supports, frames & structures.
  • All steelwork hot dip galvanised & coated.
  • Prefabrication of pipework for installation on new bridge, underneath gantry & tie-in spools.
  • All welding NDT (Non-Destructive Tested) & coated to T/SP/PA/10.
  • All structural steelwork & pipework prepared for delivery to site by REL haulage team ready for installation.

Site Preparation:

  • Carried out surveys, site clearance, ground improvement, trial holes, & formation level preparation.
  • Set up temporary welfare, offices, storage facilities & perimeter fencing.
  • Installed & later removed piling mat.

Diversion of Fire Main:

  • Excavated, pipe stringing, welding & laying of new 250mm MDPE pipework.
  • Hydrostatic testing new main, de-pressurised, drained & dewatering of new & old mains.
  • Connected new pipework into existing main at two points.
  • Refilled mains & repressurised; trench reinstated.

Piling Operations:

  • Excavated to formation level for base construction & removed spoil from site.
  • Installed 600mm diameter bored piles to 12m depth.
  • Supplied & fixed reinforcement into pile & prepared heads.
  • Carried out integrity & working load testing (1.5×).
DSC01864
Construction of Reinforced Concrete Piles
DSC01946
Construction of Turbine & Generator Slabs
DSC02041
Installation of Integrated Earthing System

Drainage:

  • Installed perimeter channel drains around turbine/generator slab.
  • Connected to existing surface water system via manholes & sump runs.

Construction of Foundations & Structures:

  • Constructed reinforced concrete foundations for:
    1. Air compressor
    2. CO₂ firefighting cabinet
    3. Diesel generator
    4. Gas conditioning skid
    5. Motor Control Centre (MCC)
    6. Turbine & generator
    7. Pipe bridge

Civil Works:

  • Constructed two 4m × 3.8m diesel generator bases at remote stations along pipeline route (BGOS & PRS).
  • Installed palisade fencing (2.4m) & gates at both locations.

Roads, Furniture & Landscaping:

  • Constructed access roads, paved footpaths, installed signage & fencing.
  • Installed lighting column bases, including backfilling & reinstatement.
  • Completed soft landscaping.

Earthing System:

  • Installation of comprehensive earthing system to support new black start & existing infrastructure.
  • System included buried 25mm x 4mm copper ring conductor with 8 bonded connections integrated within concrete slab rebar, & 7 deep-driven (4.8m) copper-bonded electrodes for fault current dissipation.
  • Two 95mm² copper cables were routed along new pipe bridge to interconnect generator compound with existing site-wide earthing network, ensuring compliance with ENA TS 41-2.
  • New system was fully compliant with step/touch voltage limits & fault clearance requirements.

Installation of Gas Supply Pipeline:

  • Tied-in new supply pipeline at existing gas compound using a 250mm–80mm weldoflange & double block & bleed valve.
  • Installed new 80mm supply pipeline running from tie-in at existing compound system to inlet connection at new gas conditioning skid.
  • New pipeline routed across existing gantries & new pipe bridge with low level pipe supports.
  • Installed tie-in pipework for connection to new gas conditioning skid using inlet arrangement with double block & bleed valve, vent/purge points & 80mm-50mm reducer.
  • All welding completed & inspected to BS EN 15614.
  • NDT completed using Phased Array Ultrasonic Testing (PAUT) & Magnetic Particle Inspection (MPI).
  • All pipework hydrotested to 67.5 barg (1.5× design pressure).
  • Pipeline commissioned & QA documentation issued.

Installation of Pipe Bridge & Structural Steelwork:

  • Installed pipe bridge & support frames on new concrete bases to BS EN ISO 14713-1, BS EN ISO 1461, & BS EN 10025-2.
  • Erected bridge, welded fabricated pipework on-site, suspended beneath gantry & applied protective coatings.
  • Pipeline route followed existing gantry for ~65m then between water tanks supported by new pipe bridge to height of 2.6m.
  • For vertical routing, pipework secured with mechanical jack supports & U-bolts for stability.
  • Supports incorporated bonded PTFE slide bearings to reduce friction & accommodate thermal expansion.
  • Pipeline supported at maximum intervals of 3.5m to ensure stress flexibility.
  • QA checks completed during & after installation.

Completion:

  • Final site clearance, reinstatement, & full demobilisation carried out.
  • Submitted all as-built records, test certificates, & handover documentation.
IMG_3294
Installation of 80mm Pipeline on Existing Gantry
DSC02632
Routing Elevatored 80mm Gas Pipeline
IMG_3171
Welding & Coating New Pipeline Insitu
DSC02562
Pipeline Field Welding Station
DSC02684
New Pipe Bridge Routed Between Water Tanks
DSC02674
Preparing Pipeline Inlet for Gas Conditioning Skid

OUTCOME

The CDC Black Start Project was successfully delivered as a fully integrated civil and mechanical infrastructure package, supporting Uniper’s strategic goal to enhance national grid resilience.

All works were carried out safely and in full compliance with CDM 2015 regulations, with zero reportable incidents throughout the project duration.

The scheme demonstrated REL’s capability to manage and deliver complex, multi-disciplinary infrastructure under stringent safety, quality, and regulatory requirements.

The project was completed on time and within budget, achieving final handover in November 2021 after successful commissioning.

DSC01710
Tie-in New Gas Supply at Existing Gas Compound
IMG-20211217-WA0005
Bespoke Pipe Stand for Gas Tie-in
DSC02686
'H' Frame Pipe Bridge for 80mm Gas Connection
DSC02450
Finished Slabs Ready for Construction Joints
IMG-20211217-WA0008
Pipeline Inlet Connection to Gas Conditioning Skid
DSC03037
Gas Conditioning Skid in Fenced Enclosure